Apartment to rent in Zürich Snowstar Zen Lauinen Saas-Grund New Build 2026/27. Attractive single-family house in a green area. Main residence. Including 2 parking spaces.
3910 Saas-Grund
Mountain view
Sunny
Balcony
Quiet
Snowflake Zenlauinen between Saas-Grund and Saas-Almagell
Snowstar new build 2025
We present to you our brand new 4.5 room single-family house Snowflake in Saas-Grund, which is located in the quiet and sunny hamlet of Zenlauinen. 2 bedrooms, 2 bathrooms, living room with mezzanine, which can be used as an office or additional bedroom. This location offers a peaceful and relaxing environment for your life, away from the hustle and bustle of the main port, but still conveniently close to the free e-shuttle bus, which takes you without changing to the Alpinexpress, Saas-Almagell, and Saas-Grund.
The chalet has modern facilities and comfortable furnishings, making it an ideal accommodation choice for families.
During the summer months, Saas-Grund offers a wide range of activities for families, including hiking, climbing, and wildlife watching. For those who want to explore the area further, the Monte Moro Pass offers a cross-border adventure to Italy, where you can visit the charming village of Macugnaga and enjoy a delicious meal.
Our single-family house is the perfect place for a peaceful family life in a green environment, where children can let off steam.
Unobstructed view of the impressive Mischabel chain with the Dom 4545!
A parking space can be purchased for Fr. 25,000.
As part of the ongoing quarter development in the hamlet "Zen Lauinen", this detached main residence chalet can be individually discussed and built as a new build. The own property (plot 1449) is accessed via the adjacent multi-family house and thus remains in the direct vicinity, car-free and very quiet and private.
Comments:
The acquisition requires taking up residence in Saas-Grund. The acquisition by Swiss citizens or foreigners with permit B or C in Switzerland is also possible if the subsequent long-term tenant in the chalet takes up their tax residence in Saas-Grund.
The construction start can be individualized in 2025. Completion 1 year after construction start. Floor plan modifications are gladly offered at this point. So the gallery floor can also be extended to a full floor. An additional bathroom in the attic is also conceivable. The chalet will not have a basement. As an extension area and replacement for the basement, a floor can be assigned and used in a neighboring barn.
Property Viewing
Four tips to protect from abuse
- Be aware of dirt cheap Offerings
- Don't make any pre payments
- Report suspicious Listings to icasa.ch
- Don't pass on any Code received via Text
